TTX_06Tech Transformation System™ 4–8 weeks

    Cloud, Infrastructure & DevOps

    Build a cloud and DevOps foundation that ships fast, scales safely and stays observable — IaC, CI/CD and SRE-grade reliability.

    Why it matters

    Without a landing zone, IaC and CI/CD discipline, every team rebuilds the same wheels and security holes appear. A real cloud foundation gives you the speed of startups with the reliability of enterprise.

    Scope covered

    Cloud strategy & landing-zone (AWS CAF / Azure CAF / GCP CFF)
    Infrastructure-as-Code (Terraform / Pulumi)
    CI/CD pipeline architecture (GitHub Actions / GitLab / ArgoCD)
    Observability stack (logs, metrics, traces, dashboards, alerts)
    SRE practices & SLO / SLA framework
    Container & Kubernetes platform setup
    How we run it

    Senior-led delivery sequence

    A senior-led delivery sequence — not a template dump. Each phase is operated with your team, not handed over as a deck.

    1. 01
      Week 1–2

      Landing zone & IAM

      Design OUs / accounts / network / IAM baseline using AWS CAF / Azure CAF / GCP CFF; lock guard-rails and tagging standards.

    2. 02
      Week 3–4

      IaC & CI/CD

      Build module library, repo conventions and pipeline-as-code; on-board 2 reference services end-to-end through environments.

    3. 03
      Week 5–6

      Observability & SLOs

      Stand up logs / metrics / traces stack with dashboards and alerts; define SLO / SLI library and error-budget policy.

    4. 04
      Week 7–8

      Container platform & cutover

      Stand up Kubernetes / container platform, migrate first workloads and lock SRE on-call and review cadence.

    Deliverables

    • Cloud strategy & landing-zone design (AWS / GCP / Azure)
    • Infrastructure-as-Code framework (Terraform / Pulumi)
    • CI/CD pipeline architecture (GitHub Actions / GitLab / ArgoCD)
    • Observability stack (logs, metrics, traces, dashboards, alerts)
    • SRE practices & SLO / SLA framework
    • Container & Kubernetes platform setup

    KPIs & Targets

    • Landing-zone deployedYes
    • IaC coverage≥95%
    • Pipeline lead time<30 min
    • SLO adherence (key services)≥99.9%

    Stakeholders

    CTOHead of PlatformSRE LeadSecurity

    Timeline

    4–8 weeks